Rhode Island's first gorgeously sunny day and I think I have heat stroke from measuring the quad for four hours.
The plans are starting to take shape though.
4.29.2011
4.28.2011
4.27.2011
Looking Towards Summer! Day 225
Because the next four weeks of finals are just too scary.
Current plans for May:
1. Finals
2. NYC Trade Shows: ICFF, Stationary & Surfaces
3. First Brimfield of the year
Current plans for June/July:
1. Architectural Structures Class at MassArt
2. RISD CE Class: Watercolor as Architectural Rending Tool
3. Visual Merchandising Internship with Anthropologie, Harvard Square
4. Sublet Providence apartment
5. Visit Tampa
6. Visit Cape Cod / Volunteer with CCMHT
7. Relaunch this blog as "1000 days of design school"
Current plans for August:
1. MOVE TO ROME
Current plans for May:
1. Finals
2. NYC Trade Shows: ICFF, Stationary & Surfaces
3. First Brimfield of the year
Current plans for June/July:
1. Architectural Structures Class at MassArt
2. RISD CE Class: Watercolor as Architectural Rending Tool
3. Visual Merchandising Internship with Anthropologie, Harvard Square
4. Sublet Providence apartment
5. Visit Tampa
6. Visit Cape Cod / Volunteer with CCMHT
7. Relaunch this blog as "1000 days of design school"
Current plans for August:
1. MOVE TO ROME
4.24.2011
Coming Back Fresh...
For the final push to May 25th!
The last day of presentations for Studio. Hard to believe we'll be there in a month. Year 1 of 3 complete.
The last day of presentations for Studio. Hard to believe we'll be there in a month. Year 1 of 3 complete.
4.07.2011
Days 202-205
4.06.2011
Day 203
4.04.2011
Day 202
My class took a field trip to the Lightolier factory in Fall River, MA and all I got were some crummy aluminum shavings.
No pictures allowed. Boo.
No pictures allowed. Boo.
4.03.2011
Day 200! (& 201)
I celebrated Day 200 by completely ignoring the mountain of mid-term studio work due this coming Thursday. Between the 5-mile run courtesy of a 6am RedBull, sangria/popover brunch and a stroll in the woods with Teddy, the day was superb. Happy 1/5th of the way through grad school!
And on Day 201, back to the grind. In-progress floor plans and section sketches for the dorms.
List of deliverables for Thursday:
1. 3 Floor Plans & 1 Section
2. Materials Board
3. 1/16" Model on top of Topographic Model
4. 1/8" take-apart Model
5. Research / path patterns / density metrics
6. Sketch-Up pulled perspectives, try watercolor?
Here's the way a list like this works:
1. You have a project due in less than a week.
2. You make a wish list of deliverables for crit day.
3. You work really hard every day until the crit.
4. Slowly, nonessential deliverables are cut in favor of delivering SOMETHING COMPLETED.
5. You go into crit obsessing about all the other visuals that would have made the project SHINE.
6. Crit happens.
7. You leave crit realizing a spread of eye candy doesn't really matter if the concept is sloppy and poorly interpreted spatially.
8. Repeat.
And Happy Birthday to Teddy, who makes me smile.
And on Day 201, back to the grind. In-progress floor plans and section sketches for the dorms.
List of deliverables for Thursday:
1. 3 Floor Plans & 1 Section
2. Materials Board
3. 1/16" Model on top of Topographic Model
4. 1/8" take-apart Model
5. Research / path patterns / density metrics
6. Sketch-Up pulled perspectives, try watercolor?
Here's the way a list like this works:
1. You have a project due in less than a week.
2. You make a wish list of deliverables for crit day.
3. You work really hard every day until the crit.
4. Slowly, nonessential deliverables are cut in favor of delivering SOMETHING COMPLETED.
5. You go into crit obsessing about all the other visuals that would have made the project SHINE.
6. Crit happens.
7. You leave crit realizing a spread of eye candy doesn't really matter if the concept is sloppy and poorly interpreted spatially.
8. Repeat.
And Happy Birthday to Teddy, who makes me smile.
4.01.2011
Subscribe to:
Posts (Atom)